Estimation mechanisms that utilize a complexity matrix

Data processing: financial – business practice – management – or co – Automated electrical financial or business practice or... – Operations research or analysis

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

Reexamination Certificate

active

07873531

ABSTRACT:
An example of a solution provided here comprises receiving project-characteristic inputs for a project, receiving major-services inputs for the project, applying analysis rules to the inputs, and outputting, for the project, at least one complexity measure that is usable in an estimation process.

REFERENCES:
patent: 5586022 (1996-12-01), Arimoto et al.
patent: 5701471 (1997-12-01), Subramanyam
patent: 5815638 (1998-09-01), Lenz et al.
patent: 5907488 (1999-05-01), Arimoto et al.
patent: 6219654 (2001-04-01), Ruffin
patent: 6223092 (2001-04-01), Miyakawa et al.
patent: 6249769 (2001-06-01), Ruffin et al.
patent: 6434438 (2002-08-01), Jin et al.
patent: 6453269 (2002-09-01), Quernemoen
patent: 6651244 (2003-11-01), Smith et al.
patent: 6658643 (2003-12-01), Bera
patent: 6810401 (2004-10-01), Thompson et al.
patent: 7412430 (2008-08-01), Moore
patent: 2003/0033586 (2003-02-01), Lawler
patent: 2003/0055702 (2003-03-01), Waterston
“COCOMO II Model Definition Manual”, USC Center for Software Engineering, Oct. 2, 1998, 37 pages.
Banker, Rajiv D. et al., “Software Complexity and Maintenance Costs”, Communications of the ACM, vol. 36, Issue 11, Nov. 1993, pp. 81-94.
Benyahia, Hadj, “Costs and Productivity Estimation in Computer Engineering Economics”, The Engineering Economist, Spring, 1996, vol. 41, Issue 3, pp. 229-241.
Boehm, Barry W. et al., “Software Cost Estimation with Cocomo II”, Prentice Hall, 2000, 183 pages.
Clark, Bradford et al., “Calibrating the COCOMO II Post-Architecture Model”, 20th International Conference on Software Engineering, Apr. 1998, 4 pages.
Ernest-Jones, Terry, “How Long is a Piece of Software”, Computer Weekly, Issue 1200, Feb. 8, 1990, 4 pages.
Feuche, Mike, “Attention is Being Generated by Complexity Metrics Tools”, MIS Week, vol. 9, Issue 9, Feb. 29, 1988, 3 pages.
Gidado, K. I., “Project Complexity: The Focal Point of Construction Production Planning”, Construction Management and Economics, vol. 14, Jan. 4, 1996, pp. 213-225.
Hantos, Peter, “Software Estimation Experiences at Xerox”, 15th International Forum on COCOMO and Software Cost Estimation, Oct. 24-27, 2000, 21 pages.
Kaiser, Javaid, “Identification of Factors that Affect Software Complexity”, University of Kansas, Requirement for master's degree, Dec. 1985, 86 pages.
Kim, Jongbae et al., “Sources and Assessment of Complexity in NPD Projects”, R&D Management, vol. 33, Issue 1, Jan. 2003, pp. 15-30.
Kim, Yongbeom et al., “Software Reuse: Survey and Research Directions”, Journal of Management Information Systems, vol. 14, Issue 4, Spring 1998, pp. 113-147.
Lima, Osias D. et al., “A Fuzzy Model for Function Point Analysis to Development and Enhancement Project Assessments”, CLEI Electronics Journal, vol. 5, Iss. 2, 1999, pp. 1-14.
Menzies, Tim et al., “Model-Based Tests of Truisms”, Proceedings of the 17th IEEE International Conference on Automated Software Engineering, 2002, pp. 1-10.
Oriogun, Peter K., “A Survey of Boehm's Work on the Spiral Models and COCOMO II—Towards Software Development Process Quality Improvement”, Software Quality Journal, vol. 8, 1999, pp. 53-62.
Smith, Preston G. et al., “Shortening the Product Development Cycle”, Research Technology Management, vol. 35, Issue 3, May/Jun. 1992, pp. 44-49.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Estimation mechanisms that utilize a complexity matrix does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Estimation mechanisms that utilize a complexity matrix, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Estimation mechanisms that utilize a complexity matrix will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2707888

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.