Hydraulic and earth engineering – Underground passageway – e.g. – tunnel – Boring
Patent
1982-05-11
1984-07-10
Corbin, David H.
Hydraulic and earth engineering
Underground passageway, e.g., tunnel
Boring
405145, 405150, 405288, E21D 904
Patent
active
044590644
ABSTRACT:
The reinforced concrete structure of this construction comprises tubular elements of permanent shuttering, connected by structural parts defined by external pile planks and internal permanent shuttering tangential to the tubular elements. The method of building consists in driving in the tubular elements and the pile planks over the entire length of the construction, emptying the tubular elements of the earth with which they are filled, reinforcing and casting concrete into these elements, excavating the interior of the section defined by these tubular elements and the pile planks, progressively disposing props, inserting the inner shuttering between these props and these tubular elements and subsequently reinforcing and casting concrete between this shuttering and the pile planks.
REFERENCES:
patent: 2067493 (1937-01-01), Kinzie
patent: 2099543 (1937-11-01), Stevens
patent: 3855801 (1974-12-01), Bernold
patent: 4009579 (1977-03-01), Patzner
patent: 4369002 (1983-01-01), Kostylev et al.
Corbin David H.
Dubno Herbert
Ross Karl F.
LandOfFree
Elongated underground construction having a uniform section and does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Elongated underground construction having a uniform section and , we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Elongated underground construction having a uniform section and will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-1574665