Electrical computers: arithmetic processing and calculating – Electrical digital calculating computer – Particular function performed
Reexamination Certificate
2006-05-30
2006-05-30
Chaki, Kakali (Department: 2193)
Electrical computers: arithmetic processing and calculating
Electrical digital calculating computer
Particular function performed
Reexamination Certificate
active
07054898
ABSTRACT:
A processor having a floating point execution unit with improved parallelism in the adder (add/subtract) unit is disclosed. A preferred aspect of the invention is a new use of the compare logic in the floating point execution unit, coupled with an end-around-carry bit value calculator, to allow the correct rounding choice of the operands to be made before the mantissa portions of the operands are subtracted (added) rather than after.
REFERENCES:
patent: 5111421 (1992-05-01), Molnar et al.
patent: 5247471 (1993-09-01), Hilker et al.
patent: 5272660 (1993-12-01), Rossbach
patent: 5487022 (1996-01-01), Simpson et al.
patent: 5677861 (1997-10-01), Inoue et al.
patent: 5685009 (1997-11-01), Blomgren et al.
patent: 5696955 (1997-12-01), Goddard et al.
patent: 5761103 (1998-06-01), Oakland et al.
patent: 5790445 (1998-08-01), Eisen et al.
patent: 6061707 (2000-05-01), Dibrino et al.
patent: 6148316 (2000-11-01), Herbert et al.
patent: 6205461 (2001-03-01), Mansingh
patent: 6298367 (2001-10-01), Oberman et al.
Stamatis et al., S/370 Sign-Magnitude Floating-Point Adder, Aug. 1989, IEEE Journal of Solid-State Circuits vol. 24, No. 4, pp. 1062-1069.
Chng Choon Ping
Tzeng Allan Tzungren
Chaki Kakali
Do Chat C.
Martine & Penilla & Gencarella LLP
Sun Microsystems Inc.
LandOfFree
Elimination of end-around-carry critical path in floating... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Elimination of end-around-carry critical path in floating..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Elimination of end-around-carry critical path in floating... will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-3616609