Measuring and testing – Muscular force
Patent
1978-11-30
1980-04-29
Swisher, S. Clement
Measuring and testing
Muscular force
B01L 502
Patent
active
041999878
ABSTRACT:
An electronic system for selectively measuring predetermined athletic parameters, such as reaction time and impact energy, and for displaying the results of the measurements is disclosed. The system includes transducer apparatus for sensing a participant's athletic reaction or motion, a selectively actuable timing circuitry responsive to initiation for providing after a pseudo-random delay a start signal to which the participant is to respond, and logic circuitry responsive to the transducer output. The timing circuit utilizes information provided by the logic circuitry and provides outputs indicative of predetermined parameters of the participant's motion or reaction time. The disclosed system further includes display apparatus responsive to the timing circuit outputs for displaying indicia of the measured parameters.
REFERENCES:
patent: 1199278 (1916-09-01), Koch
patent: 3712122 (1973-01-01), Harris
patent: 4027875 (1977-06-01), Hurley
patent: 4055842 (1977-10-01), Yakshin
Bauers William R.
Ceccon Claude R.
Mioduski Paul
Bauers William Roy
Corr Denis E.
Swisher S. Clement
LandOfFree
Electronic system for measuring time, impact energy and other at does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Electronic system for measuring time, impact energy and other at, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Electronic system for measuring time, impact energy and other at will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-1679118