Data processing: financial – business practice – management – or co – Automated electrical financial or business practice or... – Health care management
Reexamination Certificate
2008-03-25
2008-03-25
Knight, Anthony (Department: 2121)
Data processing: financial, business practice, management, or co
Automated electrical financial or business practice or...
Health care management
C700S097000, C700S108000, C705S007380, C705S002000, C703S001000
Reexamination Certificate
active
07349863
ABSTRACT:
A dynamic planning method (DPM) generates a DPM project planning model. The DPM project planning model provides an activity pre-structured process model for activities of a DPM project plan. The DPM project planning model also provides a relationship pre-structured model for activity time precedence relationships of the DPM project plan. The DPM project planning model is dynamically adjusted to generate a DPM project plan, whereby reliability buffers are associated with one or more activities of the plan. Time precedence relationships are associated with the reliability buffers and with the activities. A variety of DPM simulation outputs are also generated. The DPM simulation outputs provide a comparison of the DPM project plan with conventional project plans generated by conventional project planning models.
REFERENCES:
patent: 4368509 (1983-01-01), Li
patent: 4472770 (1984-09-01), Li
patent: 4710864 (1987-12-01), Li
patent: 4797839 (1989-01-01), Powell
patent: 4852001 (1989-07-01), Tsushima
patent: 4910660 (1990-03-01), Li
patent: 4937743 (1990-06-01), Rassman et al.
patent: 5016170 (1991-05-01), Pollalis et al.
patent: 5021976 (1991-06-01), Wexelblat et al.
patent: 5053970 (1991-10-01), Kurihara et al.
patent: 5057992 (1991-10-01), Traiger
patent: 5111404 (1992-05-01), Kotani
patent: 5128860 (1992-07-01), Chapman
patent: 5148365 (1992-09-01), Dembo
patent: 5173869 (1992-12-01), Sakamoto et al.
patent: 5229948 (1993-07-01), Wei et al.
patent: 5303170 (1994-04-01), Valko
patent: 5321620 (1994-06-01), Tanaka et al.
patent: 5369570 (1994-11-01), Parad
patent: 5381332 (1995-01-01), Wood
patent: 5414843 (1995-05-01), Nakamura et al.
patent: 5524077 (1996-06-01), Faaland et al.
patent: 5537524 (1996-07-01), Aprile
patent: 5623404 (1997-04-01), Collins et al.
patent: 5671360 (1997-09-01), Hambrick et al.
patent: 5737728 (1998-04-01), Sisley et al.
patent: 5748907 (1998-05-01), Crane
patent: 5761674 (1998-06-01), Ito
patent: 5764543 (1998-06-01), Kennedy
patent: 5765139 (1998-06-01), Bondy
patent: 5767848 (1998-06-01), Matsuzaki et al.
patent: 5826252 (1998-10-01), Wolters et al.
patent: 5893074 (1999-04-01), Hughes et al.
patent: 5907490 (1999-05-01), Oliver
patent: 5918219 (1999-06-01), Isherwood
patent: 6047260 (2000-04-01), Levinson
patent: 6101481 (2000-08-01), Miller
patent: 6122633 (2000-09-01), Laymann et al.
patent: 6289340 (2001-09-01), Puram et al.
patent: 6415196 (2002-07-01), Crampton et al.
patent: 6931365 (2005-08-01), Mehta et al.
patent: WO101206 (2001-01-01), None
Allweyer et al., “Model-Based Re-Engineering in the European Construction Industry” 1996, Construction Informatics Digital Library, p. 1-11.
Mora et al., “Dynamic Planning and Control Methodology for Design/Build Fast-Track Construction Projects” (Jan./Feb. 2001), p. 1-17.
ReDS—a dynamic planning, scheduling, and control system for manufacturing. Hadavi, K; Shahraray, M S; Voigt, Journal of Manufacturing Systems. vol. 9, No. 4, pp. 331-344. 1990.
Sawimey-A., “Petri Net Based Simulation of Construction Schedules” IEEE 1997. p. 1111-1118.
Li, Michael In-Chiang, “A Robust Planning and Control Methodology for Design-Build Fast-Track Civil Engineering and Architectural Projects”, Feb. 1999, pp. 1-107.
Park, Moonseo, “Robust Control of Cost Impact on Fast-Tracking Building Construction Projects,” Jun. 1999, pp. 2-75.
Park, M. and Peña-Mora, F., “Dynamic Planning and Control of Large-Scale Infrastructure Projects,” ASCE/ICCCBE 2000 Conference I Computing in Civil and Building Engineering, Stanford, CA, ASCE Press, Redmond, VA Aug. 2000, pp. 414-467.
Park, Moonseo et al., “Dynamic Planning and Control of Construction Projects”, Aug. 15, 2000, pp. 301-347.
Peña-Mora, Feniosky and Park, Moonseo, “Dynamic Planning and Control Methodology for Large-Scale Infrastructure Projects,” Mar. 2001, pp. 301-347.
Lee, SanHyun, “Research Progress Report The Dynamic Planning and Control Methodology in Global Construction Management,” Research Progress Report, MIT, Mar. 23, 2001, pp. 1-37.
Fulenwider, Margaret, “Dynamic Planning and Control for Large-Scale Infrastructure Projects: Route 3N as a Case Study,” Research Progress Report, MIT, Mar. 23, 2001, 38 pgs.
Park, Moonseo, “Dynamic Planning and Contol Methodology for Large-Scale Concurrent Construction Projects,” Apr. 3, 2001, pp. 348-372.
Park, M. and Peña-Mora, F., Reliability Buffering for Concurrent Construction, submitted for review to the ASCE Journal of Construction Engineering and Management, Jun. 2001, pp. 284-300.
Peña-Mora, Feniosky, and Park, Moonseo, “Dynamic Planning for Fast-Tracking Building Construction Projects,” ASCE Journal of Construction Engineering and Management, vol. 127, No. 6, Dec. 2001, pp. 1-12.
Peña-Mora, Feniosky and Dwivedi, G., “Multiple Device Collaborative and Real Time Analysis System for Project Management in Civil Engineering,” ASCE Journal of Computing in Civil Engineering, vol. 16, No. 1, Jan. 2002, pp. 373-401.
Peña-Mora et al.; “Component-based Software Development for Integrated Construction Management Software Applications;” Aug. 2000; Artifical Intelligence for Engineering Design; pp. 173-187.
Fulenwider Margaret
Lee Sang-hyun
Li Michael
Park Moonseo
Peña-Mora Feniosky
Daly, Crowley & Mofford & Durkee, LLP
Knight Anthony
Massachusetts Institute of Technology
Stevens Thomas
LandOfFree
Dynamic planning method and system does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Dynamic planning method and system, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Dynamic planning method and system will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-2796574