Differential coding circuit with reduced critical path applicabl

Pulse or digital communications – Repeaters – Testing

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

Other Related Categories

358135, 332 11D, H04B 1406

Type

Patent

Status

active

Patent number

047714395

Description

ABSTRACT:
A differential coding circuit including a subtracter, a quantizer for quantizing a differential signal from the subtracter, and a predicted signal generating circuit for generating a predicted signal on the basis of a quantized differential signal from the quantizer. The subtracter subtracts the quantized differential signal of the quantizer and the predicted signal from the sampled input signal. The critical path of the circuit is shortened, therefore the operation speed of the differential coding circuit increases.

REFERENCES:
patent: 4179710 (1979-12-01), Ishiguro et al.
patent: 4317208 (1982-02-01), Araseki et al.
patent: 4470146 (1984-09-01), Yatsuzuka et al.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Differential coding circuit with reduced critical path applicabl does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Differential coding circuit with reduced critical path applicabl, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Differential coding circuit with reduced critical path applicabl will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-810630

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.