Determining scheduling priority using fabrication simulation

Data processing: generic control systems or specific application – Specific application – apparatus or process – Product assembly or manufacturing

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C700S100000

Reexamination Certificate

active

07460920

ABSTRACT:
A method for processing workpieces in a process flow including a plurality of operations includes employing a fabrication simulation model of the process flow to determine an estimated completion time for a selected workpiece. The fabrication simulation model simulates the processing of the selected workpiece and other workpieces in the process flow through the plurality of operations. The priority of the selected workpiece is adjusted based on a comparison between a target completion time for the selected workpiece and the estimated completion time.

REFERENCES:
patent: 5751580 (1998-05-01), Chi
patent: 2003/0130756 (2003-07-01), Baweja et al.
patent: 2005/0015168 (2005-01-01), Cho

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Determining scheduling priority using fabrication simulation does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Determining scheduling priority using fabrication simulation, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Determining scheduling priority using fabrication simulation will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-4021842

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.