Demand-driven scheduling system and method

Data processing: generic control systems or specific application – Specific application – apparatus or process – Product assembly or manufacturing

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C700S095000, C708S008000

Reexamination Certificate

active

06973359

ABSTRACT:
A process is scheduled based on one or more tasks identified as control tasks from a set of tasks comprising part of a job. A desired work-in-progress load time level is set for each of the identified control tasks, and a time load on each of the identified control tasks is determined for each new job, each new job comprising one or more tasks. New jobs are released based on the desired work-in-progress load time level for one or more control tasks to approximately maintain the set desired work-in-progress load time level.

REFERENCES:
patent: 5523952 (1996-06-01), Inada
patent: 5880960 (1999-03-01), Lin et al.
patent: 5881284 (1999-03-01), Kubo
patent: 61221905 (1986-10-01), None

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Demand-driven scheduling system and method does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Demand-driven scheduling system and method, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Demand-driven scheduling system and method will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3486414

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.