Dentistry – Apparatus – Broach
Reexamination Certificate
2005-09-13
2005-09-13
O'Connor, Cary E. (Department: 3732)
Dentistry
Apparatus
Broach
Reexamination Certificate
active
06942484
ABSTRACT:
Methods and apparatus providing a critical set of endodontic instruments. The set includes a first endodontic instrument, a second endodontic instrument, and a third endodontic instrument. Each endodontic instrument includes a working portion that has a cone-like shape. Each working portion having an effective contact area defined by the exposed surface area of the working portion's respective cone-like shape. The difference between the effective contact areas of the first endodontic instrument and second endodontic instrument being substantially the same as the difference between the effective contact areas of the second endodontic instrument and third endodontic instrument.
REFERENCES:
patent: 4353698 (1982-10-01), McSpadden
patent: 4457710 (1984-07-01), McSpadden
patent: 4992048 (1991-02-01), Goof
patent: 5503554 (1996-04-01), Schoeffel
patent: 5605460 (1997-02-01), Heath et al.
patent: 5676541 (1997-10-01), Maillefer et al.
patent: 5882198 (1999-03-01), Taylor et al.
patent: 5902106 (1999-05-01), McSpadden
patent: 5938440 (1999-08-01), McSpadden
Fish & Richardson P.C.
O'Connor Cary E.
LandOfFree
Critical path endodontic instruments for preparing... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Critical path endodontic instruments for preparing..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Critical path endodontic instruments for preparing... will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-3372201