Controlling production

Wells – Processes – With indicating – testing – measuring or locating

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C166S053000, C166S386000, C166S066000, C166S369000

Reexamination Certificate

active

06505682

ABSTRACT:

BACKGROUND
The invention relates to controlling production.
As shown in
FIG. 1
, a subterranean well might have a lateral wellbore that is lined by a monobore casing
12
. Besides supporting the lateral wellbore, the monobore casing
12
serves as a conduit to carry well fluids out of the lateral wellbore. The lateral wellbore extends through several regions called production zones where a producing formation has been pierced by explosive charges to form fractures
14
in the formation. Near the fractures
14
, the monobore casing
12
has perforations
16
which allow well fluid from the formation to flow into a central passageway of the monobore casing
12
. The well fluid flows though the monobore casing
12
into a production tubing
11
which carries the well fluid to the surface of the well. The well fluid typically contains a mixture of fluids, such as water, gas, and oil.
To aid the well fluid in reaching the surface, a pump
10
is typically located in the production tubing
11
near the union of the production tubing
11
and the casing
12
. The pump
10
typically receives power through power cables
2
which extend downhole to the pump
10
from the surface. Annular packers
2
are typically used to form a seal between the pump
10
and the interior of the production tubing
11
.
SUMMARY
The invention provides a tubing that has radial ports for controlling the flow of well fluid into a passageway of the tubing. Each port detects a composition of the well fluid and based on the detected composition, the port controls the flow of the well fluid into the passageway. As a result, production zones of a wellbore may be isolated, and the failure of one production zone does not require a complete shut-down of the wellbore.
In one embodiment, the invention features a tubing for use in a well bore capable of furnishing a well fluid. The tubing has an annular member having a passageway. The tubing has at least one port that is connected to detect a composition of the well fluid and control flow of the well fluid into the passageway based on the composition.
In another embodiment, the invention features a method for use in a well bore capable of furnishing a well fluid. The method includes detecting a composition of the well fluid. The flow of the well fluid into a passageway of a tubing is automatically controlled based on the composition.
Other advantages and features will become apparent from the description and from the claims.


REFERENCES:
patent: 3739845 (1973-06-01), Berry et al.
patent: 3951338 (1976-04-01), Genna
patent: 4936386 (1990-06-01), Colangelo
patent: 5609204 (1997-03-01), Rebardi et al.
patent: 5662165 (1997-09-01), Tubel et al.
patent: 6119780 (2000-09-01), Christmas
patent: 6138754 (2000-10-01), Veneruso et al.
patent: 6176312 (2001-01-01), Tubel et al.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Controlling production does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Controlling production, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Controlling production will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3043882

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.