Metal founding – Process – With measuring – testing – inspecting – or condition determination
Reexamination Certificate
2011-07-26
2011-07-26
Kerns, Kevin P (Department: 1735)
Metal founding
Process
With measuring, testing, inspecting, or condition determination
C164S066100, C164S259000, C164S151400, C164S154600, C164S154800
Reexamination Certificate
active
07984747
ABSTRACT:
A control method for supplying an inert gas from an inert gas source to a storage container for a molten metal through a gas feed path provided with a flow sensor for monitoring the gas flow rate and a solenoid valve for opening and closing the gas feed path for use with metal molding. The control method includes steps of turning off the solenoid valve if a temperature of the storage container is lower than a preset temperature, and turning off the flow sensor; otherwise turning on the solenoid valve and turning on the flow sensor; and stopping the output of the heater of the storage container when the gas flow rate is lower than the preset amount; these steps are controlled in accordance with a command signal from a controller.
REFERENCES:
patent: 6487905 (2002-12-01), Koda et al.
patent: 2002-361386 (2002-12-01), None
patent: 2002361386 (2002-12-01), None
Miyagawa Mamoru
Takeuchi Yasuhiko
Uwadaira Ikuo
Kerns Kevin P
Nissei Plastic Industrial Co. Ltd.
Weingarten Schurgin, Gagnebin & Lebovici LLP
LandOfFree
Control method for supplying inert gas during metal molding does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Control method for supplying inert gas during metal molding, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Control method for supplying inert gas during metal molding will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-2682427