Continuous change order processing

Classifying – separating – and assorting solids – Sorting special items – and certain methods and apparatus for... – Sorting paper money

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C194S206000

Reexamination Certificate

active

07422117

ABSTRACT:
A currency processing machine and method, system, and computer program product for filling change orders is provided. In one embodiment, the currency processing machine includes a document input which receives a stack of documents and feeds single documents from the stack of documents into the document processing machine. The currency processing machine also includes an information collection system collects identifying information about the documents, sorting bins for receiving the documents, a sorter; and a data processing system. The data processing system receives information regarding the quantity of each of several denominations needed by a customer for a change order and dynamically dedicates at least one of the sorting bins for use for filling the change order. The data processing system instructs the sorter to deliver specified quantities of notes of specified denominations to the sorting bins designated for use for filling the change order.

REFERENCES:
patent: 3222057 (1965-12-01), Couri
patent: 3304080 (1967-02-01), Greenblott et al.
patent: 3759382 (1973-09-01), Walkley et al.
patent: 3932272 (1976-01-01), Carnes, Jr. et al.
patent: 4025420 (1977-05-01), Horino
patent: 4264808 (1981-04-01), Owens et al.
patent: 4357528 (1982-11-01), Smith et al.
patent: 4465192 (1984-08-01), Ohba et al.
patent: 4677682 (1987-06-01), Miyagawa et al.
patent: 4845917 (1989-07-01), Omura et al.
patent: 4905839 (1990-03-01), Yuge et al.
patent: 4905840 (1990-03-01), Yuge et al.
patent: 5012932 (1991-05-01), Omura et al.
patent: 5022531 (1991-06-01), Horino et al.
patent: 5105364 (1992-04-01), Kawamura et al.
patent: 5247159 (1993-09-01), Yuge et al.
patent: 5478992 (1995-12-01), Hamada et al.
patent: 5692067 (1997-11-01), Raterman et al.
patent: 5917930 (1999-06-01), Kayani et al.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Continuous change order processing does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Continuous change order processing, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Continuous change order processing will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3988429

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.