Bridges – Girder
Reexamination Certificate
2008-05-20
2008-05-20
Hartmann, Gary S (Department: 3671)
Bridges
Girder
C014S077100
Reexamination Certificate
active
10555927
ABSTRACT:
A construction method for simple bridges or continuous bridges using prestressed concrete girder (PSC girder) and precast slabs (PSC slabs) where prestress is applied to the lower portion of the center of the girder. bridges of low clearance and long span are constructed by preventing a loss of prestress due to load of the slabs and relieving excessive compression force generated on the upper edge portion of the center of the girder during the construction of the bridge.
REFERENCES:
patent: 5479748 (1996-01-01), Siller
patent: 5655243 (1997-08-01), Kim
patent: 5867855 (1999-02-01), Kim
patent: 6751821 (2004-06-01), Han
patent: 2006/0137115 (2006-06-01), Park
patent: 2 616 166 (1988-12-01), None
patent: 2000-204771 (1999-01-01), None
patent: 10-0349864 (2002-08-01), None
Bachman & LaPointe, L.C.
BNG Consultant Co., Ltd.
Daewoo E&C., Ltd.
Hartmann Gary S
Korea Infrastructure Safety & Technology Corporation
LandOfFree
Construction method for prestressed concrete girder bridges does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Construction method for prestressed concrete girder bridges, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Construction method for prestressed concrete girder bridges will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-3956985