Completion system

Wells – Submerged well – Wellhead

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

166 884, 166 951, 166348, 166382, E21B 3303

Patent

active

060391197

ABSTRACT:
A wellhead has, instead of a conventional Christmas tree, a spool tree (34) in which a tubing hanger (54) is landed at a predetermined angular orientation. As the tubing string can be pulled without disturbing the tree, many advantages follow, including access to the production casing hanger (21) for monitoring production casing annulus pressure, and the introduction of larger tools into the well hole without breaching the integrity of the well.

REFERENCES:
patent: 2094812 (1937-10-01), Penick et al.
patent: 2118094 (1938-05-01), McDonough
patent: 2148360 (1939-02-01), Lemley
patent: 2590688 (1952-03-01), Crain
patent: 2889886 (1959-06-01), Gould
patent: 2965174 (1960-12-01), Haeber
patent: 3041090 (1962-06-01), Ashe et al.
patent: 3043371 (1962-07-01), Rector
patent: 3064735 (1962-11-01), Bauer et al.
patent: 3090640 (1963-05-01), Otteman et al.
patent: 3098525 (1963-07-01), Haeber
patent: 3139932 (1964-07-01), Johnson
patent: 3236308 (1966-02-01), Leake
patent: 3279536 (1966-10-01), Wakefield, Jr.
patent: 3295600 (1967-01-01), Brown et al.
patent: 3299958 (1967-01-01), Todd
patent: 3310107 (1967-03-01), Yancey
patent: 3331437 (1967-07-01), Jones
patent: 3332481 (1967-07-01), Wakefield
patent: 3414056 (1968-12-01), Brown et al.
patent: 3437149 (1969-04-01), Cugini et al.
patent: 3454084 (1969-07-01), Sizer
patent: 3457992 (1969-07-01), Brown
patent: 3542125 (1970-11-01), Sizer
patent: 3545541 (1970-12-01), DeVries
patent: 3552903 (1971-01-01), Townsend
patent: 3602303 (1971-08-01), Bienkarn et al.
patent: 3638725 (1972-02-01), Ahlstone
patent: 3638732 (1972-02-01), Huntsinger et al.
patent: 3663822 (1972-05-01), Wakefield, Jr.
patent: 4053023 (1977-10-01), Herd et al.
patent: 4130161 (1978-12-01), Jones
patent: 4154302 (1979-05-01), Cugini
patent: 4289199 (1981-09-01), McGee
patent: 4436148 (1984-03-01), Maxwell
patent: 4491176 (1985-01-01), Reed
patent: 4629003 (1986-12-01), Baugh
patent: 4903774 (1990-02-01), Dykes et al.
John R. Keville letter to Lester L. Hewitt; Jan. 14, 1999 (2 p.).
Declaration of Sigbjorn Sangesland; Undated; (13 p.).
Subsea Production Technology; Oct. 23-27, 1989 and Nov. 20-24, 1989; (3 p.).
Subsea 91 International Conference, Delegate & Exhibitor List 1991 (7 p.).
Claim Chart for Claim 10; Undated; (3 p.).
Technical Opinion by Bruce C. Volkert; Jan. 10, 1999; (11 p.).
John R. Keville letter to Lester L. Hewitt; Feb. 5, 1999, (8 p.).
Claim Charts for Claims 16, 112, 110, 91; Undated; (8 p.).
Annotated Figures 1-3; Undated; (3 p.).
Cooper Cameron Admissions 152-153; Undated; (1 p.).
Depostion of Norman Brammer; Sep. 18, 1998; (3 p.).
Depostion of Peter Scott; Sep. 18, 1998; (5 p.).
Claim Charts for Claims 16, 112, 91, (4 p.).
Declaration of Sigbjorn Sangesland; Undated; (76 p.).
Claim Chart for Claim 110; Undated; (1 p.).
Cooper Cameron Admisssions 126-133; Undated; (5 p.).
Depostion of Peter Doyle; Jul. 28, 1999; (pp. 131-142, 179-182).
Deposition of Norman Brammer; (pp. 159-166).
Memorandum and Order; Feb. 19, 1999; (29 p.).
Norwegian Petroleum Directorate regulations Table of Contents and Sections 23-27, (4 p.), Jan. 20, 1997.
Norwegian Petroleum Directorate guidelines Table of Contents and Sections 2.1.3-2.3.3 and 3.2.2-3.7.1, (7 p.), Feb. 7, 1992.
Memorandum of Inventorship Contentions; Dec. 23, 1998; (5 p.).
Cooper Oil Tool; Phillips Petroleum Company Ann Subsea Facility; TMH0445, Nov. 1991; (pp. CCH 36064-36223).
SISL Subsea Submersible Pumping (S.S.P.), Second Interim Report-Technical Jun. 1991, Project No. TH/03328/89; Projects of Technological Development in the Hydrocarbons Sector (Regulation EEC 3639/85); KAS 10837-10970; Jun. 1991.
Vetco Gray; Drawings of Shell Tazerka MSP Production Tree with Tubing Hanger Spool; (1 page); undated.
Cooper Cameron; Layout Drawing of Spool Tree Arrangement for Texaco; (1 page); undated.
Cooper Cameron; Drawing of ESP Tree Arrangement for Amoco; (1 page); Dec. 18, 1989.
Cooper Cameron; Drawings of Production System Assembly--Electrical Submersible Pump for Amoco Orient re: Liuhua 11-1; (2 pages); undated.
Framo Engineering; Drawings of ESP Subsea System; (2 pages); undated.
National Oilwell Bulletin No. 186; Mudline Subsea Completion Systems; (4 pages); 1991.
Cameron Iron Works USA, Inc.; Subsea Completion System with Downhole--ESP Conceptual Design Study; Feb. 1990; (pp. AMO 02992-AMO 03130).
Document No. SSP-020-001 and 2; SISL Project Team; Subsea Submersible Pumping Project Task Series 1000 Equipment Evaluations; (p. KAS09939-KAS10023); Undated.
Document No. SSP-020-021; Subsea Intervention Systems Ltd.; Subsea Submersible Pumping Project; Final Report vol. 1, 2 and 3; (pp. KAS10024-KAS10694); Jun. 29, 1992.
Letter from Kvaerner Oilfield Products dated Jan. 16, 1998 re: Spool Tree Continuation Patent Application.
Document No. SSP-020-004; SISL Project Team; Conceptual Design Report Task Series 2000; Jan. 1991.
American Petroleum Institute; API Recommendation Practice 17A Second Edition, Sep. 1996 (Effective Date: Dec. 1, 1996); Recommended Practice for Design and Operation of Subsea Production Systems.
Division of Petroleum Engineering and Applied Geophysics; NTH. Trondheim; Mar. 1990; A Simplified Subsea System Design; Sigbjorn Sangesland; (pp. 1-18).
SPE 23050 Electrical Submersible Pumps in Subsea Completions; Sep. 3-6, 1991; P.A. Scott, M. Bowring, B. Coleman.
National Oilwell (UK) Limited; Through Bore Tree System; Jan. 1993; St. Magnus House.
Offshore Technology Conference (OTC 5689); The Subsea Systems of the Argyll Area Fields; D.S. Huber, R.C. Burnett; May 2-5, 1988; (pp. 81-90).
Offshore Technology Conference (OTC 5885); Detail Design of a Guidelineless Subsea Satellite Completion; H. B. Skeels, J.A. Martins, S.P. Singeethaml; May 1-4, 1989; (pp. 39-50).
Offshore Technology Conference (OTC 5887) Deepwater Christmas Tree Development; P. P. Alfano, C.H.N. Barbosa, M.A. Lewis; May 1-4, 1989; (pp. 57-65).
Offshore Technology Conference (OTC 6085); High-Performance Metal-Seal System for Subsea Wellhead Equipment; L. J. Milberger, C.F. Boehm; May 1-4, 1989; (pp. 411-422).
Offshore Technology Conference (OTC 6388); Subsea Trees and Controls for Australian Bass Strait Development; L. A. Gillette, R.K. Voss Jr., T. Goggans; May 7-10, 1990; (pp. 391-397).
Offshore Technology Conference (OTC 7065); A High-Voltage System for Subsea Electrical Submersible Pumping; Neil Duncan, P.A. Scott, E.R. Schweim,; May 4-7, 1992; (pp. 701-705).
SPE 16847; Equipment Selection Procedure for Subsea Trees; J. D. Otten, N. Brammer; Sep. 27-30, 1987; (pp. 121-130).
SPE 19288; Don A Cost Effective Approach to Subsea Design; B. Stoddard, J.J. Campbell; Sep. 5-8, 1989; (pp. 1-11).
American Petroleum Institute; RP 17A; Recommended Practice for Design and Operation of Subsea Production Systems; American Petrolium Institute 1987; (p. 88) In particular See pp. 15-20.
The American Society of Mechanical Engineers; The Development of the 7-1/16" Through-Bore Christmas Tree; D.S. Hubner, et al.; (undated); (pp. 99-106).
Underwater Technology Conference; Subsea Production Systems: The Search for Cost-Effective Technology; Mar. 19-21, 1990; (p. 15).
Division of Petroleum Engineering and Applied Geophysics, NTH; Simplified Subsea System Design; Oct. 23-27, 1989; (pp. 2-32).
Subsea Intervention Systems Ltd.; Subsea Applications for Downhole Pumping; M. Bowring, et al; DOT 1991; (pp. 71-78).
Design Certification Manuals; Jul. 29, 1986.
Subsea Wells; A Viable Development Alternative; Ocean Industry; Nov. 1986 (p. 1).
SPE 11176; New Generation 18-3/4-in.-15,000-psi Subsea Wellhead System; Sep. 26-29, 1982; B.F. Baugh, C.R. Gordon, G.C. Weiland.
National Supply Company (UK) Limited; Through Bore Tree system and Workover Riser 7-1/16" 5000 psi; Jun. 1985.
National Supply Company (UK) Limited; Through Bore Tree system and Workover Riser 7-1/16"-5M; Oct. 1985.
OTC 5847; Subsea Template and Trees for Green Canyon Block 29 Development; May 2-5, 1988; M.L. Teers, T.M. Stroud, A.J. Masciopinto.
OTC 5809; Critical Points for the Project of Very Deep Subsea Completions; May 2-5, 1988; J.M. Formigli Filho, O.J.S. Ribeiro.
Oil & Gas Journal; Completion

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Completion system does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Completion system, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Completion system will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-722730

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.