Closed loop multiphase underbalanced drilling process

Wells – Processes – With indicating – testing – measuring or locating

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C166S267000, C417S251000, C417S265000

Reexamination Certificate

active

07654319

ABSTRACT:
The present invention provides apparatus and methods for handling fluids returning from a well. The fluids are introduced into a separator and a separated gas stream is recovered or recycled. The gas stream may comprise more than one phase. The separated gas stream is urged through a multiphase pump before it is recovered. Alternatively, the return fluids may pass through a multiphase pump before it is introduced into the separator.

REFERENCES:
patent: 5390743 (1995-02-01), Giannesini
patent: 5660532 (1997-08-01), Castel
patent: 5795135 (1998-08-01), Nyilas et al.
patent: 6007306 (1999-12-01), Vilagines
patent: 6032747 (2000-03-01), Moody et al.
patent: 6068053 (2000-05-01), Shaw
patent: 6164308 (2000-12-01), Butler
patent: 6209641 (2001-04-01), Stevenson
patent: 6216799 (2001-04-01), Gonzalez
patent: 6234258 (2001-05-01), Karigan
patent: 6325147 (2001-12-01), Doerler et al.
patent: 6367566 (2002-04-01), Hill
patent: 6454542 (2002-09-01), Back
patent: 6578637 (2003-06-01), Maus et al.
patent: 6592334 (2003-07-01), Butler
patent: 6668943 (2003-12-01), Maus et al.
patent: 2003/0085036 (2003-05-01), Curtis et al.
patent: 2004/0031622 (2004-02-01), Butler et al.
patent: 2005/0061514 (2005-03-01), Hopper
patent: 2006/0202122 (2006-09-01), Gunn et al.
patent: 2006/0207795 (2006-09-01), Kinder et al.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Closed loop multiphase underbalanced drilling process does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Closed loop multiphase underbalanced drilling process, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Closed loop multiphase underbalanced drilling process will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-4207945

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.