Cascaded control of an average value of a process parameter...

Data processing: generic control systems or specific application – Generic control system – apparatus or process – Optimization or adaptive control

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C700S029000, C700S033000, C700S036000, C700S037000, C700S044000, C700S048000, C700S051000, C700S108000, C700S267000, C700S272000, C700S273000, C700S008000, C702S031000, C702S032000, C702S084000, C702S182000, C702S199000, C706S021000, C706S023000, C422S172000, C422S262000, C423S243110

Reexamination Certificate

active

07117046

ABSTRACT:
At least one of the multiple process parameters (MPPs) is a controllable process parameter (CTPP) and one is a targeted process parameter (TPP). The process also has a defined target limit (DTV) representing a first limit on an actual average value (AAV) of the TPP. A first logical controller predicts future average values (FAVs) of the TPP based on the AAVs of the TPP over a first prior time period and the DTV. A second logical controller establishes a further target limit (FTV) representing a second limit on the AAV of the TPP based on one or more of the predicted FAVs, and also determines a target set point for each CTPP based on the AAVs of the TPP over a prior time period and the FTV. The second logical controller directs control of each CTPP in accordance with the determined target set point.

REFERENCES:
patent: 4423018 (1983-12-01), Lester et al.
patent: 4487784 (1984-12-01), Kuroda et al.
patent: 5167009 (1992-11-01), Skeirik
patent: 5212765 (1993-05-01), Skeirik
patent: 5282261 (1994-01-01), Skeirik
patent: 5386373 (1995-01-01), Keeler et al.
patent: 5479573 (1995-12-01), Keeler et al.
patent: 5548528 (1996-08-01), Keeler et al.
patent: 5729661 (1998-03-01), Keeler et al.
patent: 5781432 (1998-07-01), Keeler et al.
patent: 5933345 (1999-08-01), Martin et al.
patent: 6002839 (1999-12-01), Keeler et al.
patent: 6047221 (2000-04-01), Piche et al.
patent: 6243696 (2001-06-01), Keeler et al.
patent: 6278899 (2001-08-01), Piche et al.
patent: 6493596 (2002-12-01), Martin et al.
patent: 6542852 (2003-04-01), Chen et al.
patent: 6611726 (2003-08-01), Crosswhite
patent: 6625501 (2003-09-01), Martin et al.
patent: 6662185 (2003-12-01), Stark et al.
patent: 6746237 (2004-06-01), Storm et al.
patent: 6856855 (2005-02-01), Hirata et al.
patent: 6865509 (2005-03-01), Hsiung et al.
patent: 6882940 (2005-04-01), Potts et al.
patent: 2004/0260664 (2004-12-01), Thiesson et al.
patent: 0866395 (1998-09-01), None
patent: 1382905 (2004-01-01), None
patent: 03/065135 (2003-08-01), None
Tran, et al., “Dynamic Matrix Control on Benzene and Toluene Towers”, Oct. 1989.
O'Conner, et al., “Application of a Single Multivariable Controller to Two Hydrocracker Distillation Columns in Series”, Oct. 1991.
Brown, et al., “Adaptive, Predictive Controller for Optimal Process Control”, Los Almost National Laboratory, Los Alamos, NM, 1993.
Boyden, et al., “The Development of DMCix: The AxM-based (DMC)™ Controller Interface”, Honeywell OpenUSE Technical Exchange Seminar, Mar. 1995.
Boyden, “Controlled Variable Predictions with DMI: Temperature to Analyzer Predictors”, Jun. 1995.
Bequette, Model Predictive Control—References (Aug. 2000).
B. Hacking, “Advanced Control of Selective Catalytic Reduction (SCR) Literature and Patent Review”, Pegasus Technologies Technical Report, Mar. 2003.
B. Hacking, “Advanced Control of Wet Flue Gas Desulfurization Literature and Patent Review”, Pegasus Technologies Technical Report, Apr. 2003.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Cascaded control of an average value of a process parameter... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Cascaded control of an average value of a process parameter..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Cascaded control of an average value of a process parameter... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3715191

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.