Bridge crane, especially a container-loading bridge

Traversing hoists – Traveling bridge – Having plural trolleys

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C104S098000, C212S312000, C212S325000

Reexamination Certificate

active

06588611

ABSTRACT:

PRIOR APPLICATIONS
This application is a §371 U.S. National Phase application which bases priority on International Application No. PCT/DE00/01842, filed Jun. 7, 2000, which in turn bases priority on German Application No. DE 199 26 182.2, filed Jun. 9, 1999.
BACKGROUND OF THE INVENTION
1. Field of Invention
The invention relates to a bridge crane having a portal, a boom, a track system laid on the boom and crane trolleys which travel on the tracks.
2. Description of the Prior Art
The problem arises with bridge cranes, particularly container loading bridges, such as are more particularly used for loading and unloading container ships, that if there is only a single track, it is only possible to use in unhindered manner a single trolley. This considerably restricts the capacity of such bridge cranes.
German utility model DE 197 03 282 A1 discloses a container loading bridge in which, besides the working track which guides the trolley extending transversely to said track when the trolley is carrying a load, has a return track comprising a single rail and running laterally alongside the same, and on which the crane trolley extends longitudinally to the direction of travel, the wheel suspension mechanism of the crane trolleys being rotatable about a vertical axis in order to permit the change from the longitudinal orientation to the transverse orientation.
The known system is advantageous compared with the hitherto known proposals, but suffers from the disadvantage that as a result of the use of a single rail for the return track, problems can arise with respect to the running stability.
The problem of the invention is to improve the system known from German Utility Model DE 197 03 282 A1 with respect to the running stability of the crane trolleys to be returned.
SUMMARY OF THE INVENTION
According to the invention, this problem is solved by the features of claim 1. Claim 2 gives advantageous developments of the invention.
The invention is described in greater detail hereinafter relative to two drawings of two embodiments of the track system in diagrammatic form. With regards to other details of the bridge crane construction, reference is made to German Utility Model DE 197 03 282 A1.


REFERENCES:
patent: 1111100 (1914-09-01), Sawyer
patent: 1206226 (1916-12-01), Schilling
patent: 1327071 (1920-01-01), Taylor
patent: 1481404 (1924-01-01), Wright
patent: 1765118 (1930-06-01), Abriani
patent: 2975727 (1961-03-01), Kokoras
patent: 3365052 (1968-01-01), Kornylak
patent: 3696947 (1972-10-01), Ponsen
patent: 3700128 (1972-10-01), Noble et al.
patent: 4602566 (1986-07-01), Kernkamp et al.
patent: 4706570 (1987-11-01), Moro et al.
patent: 197 03 282 (1998-08-01), None
patent: 197 03 282 (1998-08-01), None

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Bridge crane, especially a container-loading bridge does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Bridge crane, especially a container-loading bridge, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Bridge crane, especially a container-loading bridge will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3051193

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.