Power plants – Motive fluid energized by externally applied heat – Power system involving change of state
Patent
1985-01-09
1985-12-24
Husar, Stephen F.
Power plants
Motive fluid energized by externally applied heat
Power system involving change of state
60664, 122448B, F01K 1300
Patent
active
045597855
ABSTRACT:
Boiler optimization is included in on-line control of parallel boilers by multiplying the total heat per unit time which must be supplied to all parallel boilers by the percentage of the total heat which should be supplied to each boiler by primary and secondary fuels in order to substantially maximize energy efficiency. The result of such multiplication is the heat per unit time which should be supplied to each boiler by the primary and secondary fuels. The fuel and air supplied to each boiler is controlled so as to supply the thus determined heat per unit time which not only results in maintenance of a desired header pressure but also results in substantially maximizing energy efficiency of the parallel boilers even where multiple fuels are combusted to supply heat.
REFERENCES:
patent: 3837167 (1974-09-01), Durrant et al.
patent: 4069675 (1978-01-01), Adler et al.
patent: 4418541 (1983-12-01), Russell
Gaines Larry D.
Likins, Jr. Merle R.
Husar Stephen F.
Phillips Petroleum Company
LandOfFree
Boiler control does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Boiler control, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Boiler control will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-1472473