Batch plating of a long lead frame strip

Coating processes – Immersion or partial immersion – Metal base

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

Other Related Categories

427438, 427178, 427300, 204 27, 204206, B05D 118

Type

Patent

Status

active

Patent number

039885186

Description

ABSTRACT:
A long metal lead frame strip is wound onto a reel with a plastic ribbon interleaved therein to separate adjacent turns of the strip on the reel. The reel is subsequently submersed in an immersion plating solution. Metal ions of the plating solution displace metal atoms at the surface of the strip to form a uniformly thick plating thereon, even in areas that are contacted by the spacing ribbon.

REFERENCES:
patent: 1312716 (1919-08-01), Wise
patent: 2873214 (1959-02-01), Schnable
patent: 3072499 (1963-01-01), Cole et al.
patent: 3184824 (1965-05-01), Fairbairn
patent: 3266929 (1966-08-01), Lareau et al.
patent: 3394441 (1968-07-01), Weiss
patent: 3472665 (1969-10-01), Prueter et al.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Batch plating of a long lead frame strip does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Batch plating of a long lead frame strip, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Batch plating of a long lead frame strip will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-185886

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.