Apparatus and method for gravel packing an interval of a...

Wells – Processes – Graveling or filter forming

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C166S227000, C166S051000

Reexamination Certificate

active

06702018

ABSTRACT:

TECHNICAL FIELD OF THE INVENTION
This invention relates in general to preventing the production of particulate materials through a wellbore traversing an unconsolidated or loosely consolidated subterranean formation and, in particular to, an apparatus and method for obtaining a substantially complete gravel pack within an interval of the wellbore.
BACKGROUND OF THE INVENTION
Without limiting the scope of the present invention, its background is described with reference to the production of hydrocarbons through a wellbore traversing an unconsolidated or loosely consolidated formation, as an example.
It is well known in the subterranean well drilling and completion art that particulate materials such as sand may be produced during the production of hydrocarbons from a well traversing an unconsolidated or loosely consolidated subterranean formation. Numerous problems may occur as a result of the production of such particulate. For example, the particulate causes abrasive wear to components within the well, such as tubing, pumps and valves. In addition, the particulate may partially or fully clog the well creating the need for an expensive workover. Also, if the particulate matter is produced to the surface, it must be removed from the hydrocarbon fluids by processing equipment at the surface.
One method for preventing the production of such particulate material to the surface is gravel packing the well adjacent the unconsolidated or loosely consolidated production interval. In a typical gravel pack completion, a sand control screen is lowered into the wellbore on a work string to a position proximate the desired production interval. A fluid slurry including a liquid carrier and a particulate material known as gravel is then pumped down the work string and into the well annulus formed between the sand control screen and the perforated well casing or open hole production zone.
The liquid carrier either flows into the formation or returns to the surface by flowing through the sand control screen or both. In either case, the gravel is deposited around the sand control screen to form a gravel pack, which is highly permeable to the flow of hydrocarbon fluids but blocks the flow of the particulate carried in the hydrocarbon fluids. As such, gravel packs can successfully prevent the problems associated with the production of particulate materials from the formation.
It has been found, however, that a complete gravel pack of the desired production interval is difficult to achieve particularly in long or inclined/horizontal production intervals. These incomplete packs are commonly a result of the liquid carrier entering a permeable portion of the production interval causing the gravel to form a sand bridge in the annulus. Thereafter, the sand bridge prevents the slurry from flowing to the remainder of the annulus which, in turn, prevents the placement of sufficient gravel in the remainder of the annulus.
Prior art devices and methods have been developed which attempt to overcome this sand bridge problem. For example, attempts have been made to use devices having perforated shunt tubes or bypass conduits that extend along the length of the sand control screen to provide an alternate path for the fluid slurry around the sand bridge. It has been found, however, that shunt tubes installed on the exterior of sand control screens are susceptible to damage during installation and may fail during a gravel pack operation. In addition, it has been found, that it is difficult and time consuming to make all of the necessary fluid connections between the numerous joints of shunt tubes required for typical production intervals.
Therefore a need has arisen for an apparatus and method for gravel packing a production interval traversed by a wellbore that overcomes the problems created by sand bridges. A need has also arisen for such an apparatus that is not susceptible to damage during installation or failure during use. Further, a need has arisen for such an apparatus that is not difficult or time consuming to assemble.
SUMMARY OF THE INVENTION
The present invention disclosed herein comprises an apparatus and method for gravel packing a production interval of a wellbore that traverses an unconsolidated or loosely consolidated formation that overcomes the problems created by the development of a sand bridge between a sand control screen and the wellbore. Importantly, the apparatus of the present invention is not susceptible to damage during installation or failure during use and is not difficult or time consuming to assemble.
The apparatus for gravel packing an interval of a wellbore of the present invention comprises an outer tubular forming a first annulus with the wellbore and an inner tubular disposed within the outer tubular forming a second annulus therebetween. Typically, the inner tubular is positioned around a sand control screen. Together, the sand control screen and the apparatus of the present invention are assembled at the surface and run downhole to a location proximate the production interval. A portion of the side wall of the outer tubular is an axially extending production section that includes a plurality of openings. Another portion of the side wall of the outer tubular is an axially extending nonproduction section that includes one or more outlets. Similarly, a portion of the side wall of the inner tubular is an axially extending production section that is substantially circumferentially aligned with the production section of the outer tubular. Another portion of the side wall of the inner tubular is an axially extending nonproduction section that is substantially radially aligned with the nonproduction section of the outer tubular. The production section of the inner tubular has a plurality of openings therethrough, but the nonproduction section of the inner tubular has no openings therethrough.
In the volume within the second annulus between the nonproduction sections of the outer and inner tubulars there is a channel that defines an axially extending slurry passageway with the nonproduction section of the inner tubular. The volume within the second annulus between the production sections of the outer and inner tubulars is an axially extending production pathway. The channel prevents fluid communication between the production pathway and the slurry passageway. In addition, isolation members at either end of a section of the apparatus of the present invention define the axial boundaries of the production pathway.
As such, when a fluid slurry containing gravel is injected through the slurry passageway, the fluid slurry exits the slurry passageway through outlets in the channel and the outer tubular leaving a first portion of the gravel in the first annulus. Thereafter, the fluid slurry enters the openings in the outer tubular leaving a second portion of the gravel in the production pathway. Thus, when formation fluids are produced, the formation fluids travel radially through the production pathway by entering the production pathway through the openings in the outer tubular and exiting the production pathway through the openings in the inner tubular. The formation fluids pass through the first portion of the gravel in the first annulus prior to entry into the production pathway, which contains the second portion of the gravel, both of which filter out the particulate materials in the formation fluids. Formation fluids are prevented, however, from traveling radially through the slurry passageway as there are no openings in the nonproduction section of the inner tubular.
In a typical gravel packing operation using the apparatus for gravel packing an interval of a wellbore of the present invention, the first annulus between the outer tubular and the wellbore may serve as a primary path for delivery of a fluid slurry. This region serves as the primary path as it provides the path of least resistance to the flow of the fluid slurry. When the primary path becomes blocked by sand bridge formation, the production pathway of the present invention serves as a secondary path for delivery of the f

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Apparatus and method for gravel packing an interval of a... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Apparatus and method for gravel packing an interval of a..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Apparatus and method for gravel packing an interval of a... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3205411

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.