ABSTRACT:

BRIEF DESCRIPTION OF THE INVENTION
The present invention relates generally to integrated circuits and more particularly to an apparatus for duty cycle conversion.
BACKGROUND OF THE INVENTION
Some integrated circuits decrease their associated delay times by doubling their data rates. Typically, to support data rate doubling a single phase clock input is split into true and complement clocks by a clock generator. These two internal clocks allow data sampling to occur on both the rising and falling edges of the single phase clock input.
FIG. 1
illustrates a prior art Double Data Rate input Receiver (DRR)
26
, which receives true and complement clocks from Clock Generator
20
. From the single phase clock, the CLK signal, Clock Generator
20
generates the internal true and complement clock signals, which are labeled CLKL and CLKB, respectively. To promote satisfactory receive timing margins, the CLKL and CLKB signals should be 180° apart in phase. A Duty Cycle Correction Circuit may be used to force the CLKL and CLKB signals into this relationship.
FIG. 2
illustrates a prior art Duty Cycle Correction Circuit
30
coupled to a Clock Generator
20
. The complementary clock signals, CLKL and CLKB, are input to the Duty Cycle Correction Circuit
30
. Working in concert, Duty Cycle Correction Circuit
30
and Adjustor Circuit
40
set the duty cycle of the CLK signal such that the two cross points of the CLKL and CLKB signals are separated by half the cycle time. In contrast, DRR
26
is sensitive only to the rising edges of the CLKL and CLKB signals; for optimal timing, these rising edges should be separated in phase by 180 degrees. The DCCV and DCCVB signals allow Adjustor Circuit
40
to modify the duty cycle of the CLK signal. Measuring the differences between the CLKL and CLKB signals, the Duty Cycle Correction Circuit
30
is sensitive to the cross points of the CLKL and CLKB signals. In contrast, DRR
26
is sensitive only to the rising edges of the CLKL and CLKB signals. Thus, DRR
26
and Duty Cycle Correction Circuit (DCCC)
30
use different definitions of duty cycle.
FIG. 3
plots the CLKL and CLKB signals and indicates their duty cycles using a number of definitions. Generally, duty cycle is defined as a signal's high time divided by the sum of the signal's high and low time; i.e., the total cycle time. No disagreement exists as to what constitutes a signal's total cycle time; however, there are a number of competing definitions of cycle high time. In
FIG. 3
“t
1
” indicates the high time of the CLKL signal as the time between when the rising edge of the CLKL signal crosses the falling edge of the CLKB signal and when the falling edge of the CLKL signal intersects the rising edge of the CLKB signal. Thus, t
1
represents the cross-point high time to which the DCCC
30
is sensitive. In
FIG. 3
“t
2
” indicates the high time of the CLKL signal as the time from when the voltage of the rising edge of the CLKL signal exceeds a selected threshold level to when the voltage of the rising edge of the CLKB signal exceeds the selected threshold level. Thus, t
2
represents the rising edge high time to which the DRR
26
is sensitive. Within an integrated circuit using a DRR
26
and a Duty Cycle Correction Circuit
30
even a small difference between the cross-point high time and the rising edge high time substantially impacts receive time margins. Thus, a need exists for a converter circuit to generate a pair of signals whose cross-point duty cycle is equal to the midpoint duty cycle of the CLKL and CLKB signals. Inserted between a DRR
26
and a Duty Cycle Correction Circuit
30
, such a converter circuit would improve receive time margins.
SUMMARY OF THE INVENTION
The apparatus of the present invention generates a pair of output signals whose cross-point duty cycle is substantially equal to the edge duty cycle of a pair of input signals. The apparatus of the present invention includes an edge detector and a signal generator. The edge detector detects and indicates a first transition of a first input signal and a second transition of a second input signal. The signal generator takes the outputs of the edge detector and generates a first output signal and a second output signal offset from the first output signal. The signal generator does so by forcing a first time delay between adjacent cross-over points of the first and second output signals to be substantially equal to a second time delay between the first transition and the second transition.


REFERENCES:
patent: 4583008 (1986-04-01), Grugett
patent: 5359232 (1994-10-01), Eitrheim et al.
patent: 5614855 (1997-03-01), Lee et al.
patent: 5751692 (1998-05-01), Kiml
patent: 5777500 (1998-07-01), Eitrheim et al.
patent: 6130563 (2000-10-01), Pilling et al.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Apparatus and method for edge based duty cycle conversion does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Apparatus and method for edge based duty cycle conversion, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Apparatus and method for edge based duty cycle conversion will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-2618583

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.