Agent reactive scheduling in an automated manufacturing...

Data processing: generic control systems or specific application – Specific application – apparatus or process – Product assembly or manufacturing

Reexamination Certificate

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

C700S100000, C700S121000, C705S002000

Reexamination Certificate

active

06907305

ABSTRACT:
A method and apparatus for scheduling in an automated manufacturing environment, comprising are disclosed. The method includes detecting an occurrence of a predetermined event in a process flow; notifying a software scheduling agent of the occurrence; and reactively scheduling an action from the software scheduling agent responsive to the detection of the predetermined event. The apparatus is automated manufacturing environment including a process flow and a computing system. The computing system further includes a plurality of software scheduling agents residing thereon, the software scheduling agents being capable of reactively scheduling appointments for activities in the process flow responsive to a plurality of predetermined events.

REFERENCES:
patent: 4796194 (1989-01-01), Atherton
patent: 5093794 (1992-03-01), Howie et al.
patent: 5369570 (1994-11-01), Parad
patent: 5375061 (1994-12-01), Hara et al.
patent: 5444632 (1995-08-01), Kline et al.
patent: 5446671 (1995-08-01), Weaver et al.
patent: 5548535 (1996-08-01), Zvonar
patent: 5586021 (1996-12-01), Fargher et al.
patent: 5835688 (1998-11-01), Fromherz
patent: 5890134 (1999-03-01), Fox
patent: 5953229 (1999-09-01), Clark et al.
patent: 6038539 (2000-03-01), Maruyama et al.
patent: 6088626 (2000-07-01), Lilly et al.
patent: 6128542 (2000-10-01), Kristoff et al.
patent: 6148239 (2000-11-01), Funk et al.
patent: 6202062 (2001-03-01), Cameron et al.
patent: 6263255 (2001-07-01), Tan et al.
patent: 6356797 (2002-03-01), Hsieh et al.
patent: 6374144 (2002-04-01), Viviani et al.
patent: 6400999 (2002-06-01), Kashiyama et al.
patent: 6434443 (2002-08-01), Lin
patent: 6584369 (2003-06-01), Patel et al.
U.S. Appl. No. 10/331,715, filed Dec. 30, 2002, Nettles et al.
U.S. Appl. No. 10/331,598, filed Dec. 30, 2002, Barto et al.
U.S. Appl. No. 10/331,596, filed Dec. 30, 2002, Barto et al.
U.S. Appl. No. 10/284,705, filed Oct. 31, 2002, Nettles et al.
U.S. Appl. No. 10/233,197, filed Aug. 30, 2002, Barto et al.
U.S. Appl. No. 10/232,145, filed Aug. 30, 2002, Barto et al.
U.S. Appl. No. 10/231,930, filed Aug. 30, 2002, Barto et al.
U.S. Appl. No. 10/231,888, filed Aug. 30, 2002, Barto et al.
U.S. Appl. No. 10/231,849, filed Aug. 30, 2002, Barto et al.
U.S. Appl. No. 10/231,648, filed Aug. 30, 2002, Barto et al.
U.S. Appl. No. 10/231,561, filed Aug. 30, 2002, Barto et al.
U.S. Appl. No. 10/190,194, filed Jul. 3, 2002, Li et al.
U.S. Appl. No. 10/160,990, filed May 31, 2002, Mata et al.
U.S. Appl. No. 10/160,956, filed May 31, 2002, Li et al.
U.S. Appl. No. 10/135,145, filed Apr. 30, 2002, Mata et al.
Resende, “Shop Floor Scheduling of Semiconductor Wafer Manufacturing,”University of California, Berkeley (1987).
Glassey et al., “Closed-Loop Job Release Control for VLSI Circuit Manufacturing,”IEEE Transactions on Semiconductor Manufacturing1:36-46 (1988).
“Agent-Enhanced Manufacturing System Initiative,”Technologies for the Integration of Manufacturing Applications(TIMA) (Oct. 1997).
Ebteshami et al., “Trade-Offs in Cycle Time Management: Hot Lots”, IEEE Transactions on Semiconductor Manufacturing, vol. 5, No. 2, May 1992.
“Factory Integration,”The National Technology Roadmap for Semiconductors: Technology Needs(1997).
SALSA Enhancements for next Swarm Release (Apr. 22, 1999).
SALSA Exceptions—Minutes from May 11, 1999.
Starvation Avoidance Lot Start Agent (SALSA) (Overview: Apr. 15, 1999).
Starvation Avoidance Lot Start Agent,Fab 25 AEMSI/SALSA Review Meeting(May 26, 1999).
Starvation Avoidance Lot Start Agent,Iteration 1 Requirements Kickoff(May 3, 1999).
Van Parunak, “Review of Axtell and Epstein” (Jun. 23, 1999).
Baumgärtel et al., “Combining Multi-Agent Systems and Constraint Techniques in Production Logistics” (1996).
Bonvik et al., “Improving a Kanban Controlled Production Line Through Rapid Information Dissemination” (Jul. 10, 1995).
Burke et al., “The Distributed Asynchronous Scheduler,” pp. 309-339 (1994).
Butler et al., “ADDYMS: Architecture for Distributed Dynamic Manufacturing Scheduling,” pp. 199-213 (1996).
Fordyce et al., “Integrating Decision Technologies for Dispatch Scheduling in Semiconductor Manufacturing,”Logistics Management System(LMS), pp. 473-516 (1994).
Hynynen, “BOSS: An Artificially Intelligent System for Distributed Factory Scheduling,”Computer Applications in Production and Engineering, pp. 667-677 (1989).
Interrante et al., “Emergent Agent-Based Scheduling of Manufacturing Systems”.
Juba et al., “Production Improvements Using a Forward Scheduler” (1995).
Li et al., “Minimum Inventory Variability Schedule with Applications in Semiconductor Fabrication,”IEEE Transactions on Semiconductor Manufacturing9:145-149 ()1996).
Lin et al., “Integrated Shop Floor Control Using Autonomous Agents,”IIE Transactions24:57-71 (1992).
Lu et al., “Efficient Scheduling Policies to Reduce Mean and Variance of Cycle-Time in Semiconductor Manufacturing Plants,”IEEE Transactions Semiconductor Manufacturing7:374-388 (1994).
Martin-Vega et al., “Applying Just-In-Time in a Wafer Fab: A Case Study,”IEEE Transactions on Semiconductor Manufacturing2:16-22 (1989).
Murthy et al., “Agent Based Cooperative Scheduling,” pp. 112-117 (1997).
Van Parunak et al., “Agents Do It In Time—Experiences with Agent-Based Manufacturing Scheduling” (1999).
Van Parunak et al., “Agent-Based Models & Manufacturing Processes”.
Ramos et al., “Scheduling Manufacturing Tasks Considering Due Dates: A New Method Based on Behaviours and Agendas” (1995).
Shen et al., “An Agent-Based Approach for Dynamic Manufacturing Scheduling” (1998).
Hollister, “Schedule Paper #17 Summary” (Jun. 23, 1999).
Hollister, “Schedule Paper #19 Summary” (Jun. 23, 1999).
Hollister, “Schedule Paper #23 Summary” (Jun. 23, 1999).
Hollister, “Schedule Paper #32 Summary” (Jun. 23, 1999).
Vaario et al., “An Emergent Modelling Method for Dynamic Scheduling,”Journal of Intelligent Manufacturing9:129-140 (1998).
Wellman et al., “Auction Protocols for Decentralized Scheduling” (May 22, 1998).
Weber, “Material Traceability—The Missing Link in TAP Systems,”Test, Assembly and Packaging Automation and Integration '99 Conference.
“ObjectSpace Fab Solutions Semiconductor Product Development Overview” (presented at SEMICON Southwest 1998).
“Agent Enhanced Manufacturing Systems Initiative (AEMSI) Project” presented by Dan Radin, ERIM CEC Nov. 12-13, 1998).
Weber, “APC Framework: Raising the Standard for Fab Automation and Integration,”Equipment Automation Conference 1hu stEuropean Symposium on Semiconductor Manufacturing(Apr. 14, 1999).
Wein, “Scheduling Semiconductor Wafer Fabrication,”IEEE Transactions on Semiconductor Manufacturing1:115-130 (1988).
Bonvik, “Performance Analysis of Manufacturing Systems Under Hybrid Control Policies” (Sep. 22, 1995).
Bonvik, “Performance Analysis of Manufacturing Systems Under Hybrid Control Policies” (Oct. 3, 1995).
Sikora et al., “Coordination Mechanisms for Multi-Agent Manufacturing Systems: Applications to Integrated Manufacturing Scheduling,”IEEE Transactions on Engineering Management44:175-187 (1997).
Sousa et al., “A Dynamic Scheduling Holon for Manufacturing Orders,”Journal of Intelligent Manufacturing9:107-112 (1998).
Upton et al., “Architectures and Auctions in Manufacturing,”Int. J. Computer Integrated Manufacturing4:23-33 (1991).
Fordyce et al., “Logistics Management System (LMS): An Advanced Decision Support System for the Fourth Decision Tier-Dispatch or Short Interval Scheduling,”, pp. 1-58 (1994).
Gere, “Heuristics in Job Shop Scheduling,”Management Science13:1

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Agent reactive scheduling in an automated manufacturing... does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Agent reactive scheduling in an automated manufacturing..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Agent reactive scheduling in an automated manufacturing... will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-3501445

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.