Discrete-event simulation-based method for staffing highway main

Boots – shoes – and leggings

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

395209, G06F 1710

Patent

active

056173423

ABSTRACT:
A maintenance management system is disclosed for staffing highway maintenance crews using discrete-event simulation and optimization techniques. Conveniently, the system is organized in four stages; making determinations, model building, simulation model, and experimentation and analysis. Determinations support setting agency's own standards regarding maintenance including identifying maintenance specialities, establishing standard crews, setting standard productivity rates, estimating optimum maintenance workloads, estimating costs of delaying maintenance, and deciding the planning period. Model building involves outlining the repair request system including highway system configuration, organization structure, crew assignments, input data, and maintenance model. The simulation model executes an initialization routine and events and runs the events through a time and event schema until the event queue in the simulator is emptied. The experimentation and analysis stage includes designing experiments, generating data, and employing optimization techniques to determine the optimum size of the maintenance staff.

REFERENCES:
patent: 4901260 (1990-02-01), Lubachevsky
patent: 4965743 (1990-10-01), Malin et al.
patent: 5140537 (1992-08-01), Tullis
patent: 5229948 (1993-07-01), Wei et al.
patent: 5305221 (1994-04-01), Atherton
patent: 5343388 (1994-08-01), Wedelin
patent: 5369570 (1994-11-01), Parad
patent: 5381332 (1995-01-01), Wood
patent: 5406476 (1995-04-01), Deziel et al.
Osmani et al., "Evaluation of Road Maintenance Automation", Jour of Transportation Eng'rg, vol. 122, Iss 1, Jan. 1996, pp. 50-58.
Denning, "Expert Systems: Ready to Hit The Road?", Civil Engineering, Jun. 1992, pp. 71-74.
Foo et al., "Prototype Knowledge-Based System for Corrective Maintenance of Pavements", Jour of Transp. Eng'rg, vol. 121, No. 6, Nov. 1995, pp. 517-523.
Fwa et al., "Road-Maintenance Planning Using Genetic Algorithm:Analysis", Jour of Tranp. Eng'rg, vol. 120, No. 5, Sep. 1994, pp. 710-722.
Chan et al., "Road-Maintenance Planning Using Genetic Algorithm: Formulation", Jour of Transp Eng'rg, vol. 120, No. 5, Sep. 1994, pp. 693-709.
R.B. Newman, et. al, Maintenance Contracting, Dec. 1991, 10-11, Transportation Research Board Report #344/Attached are Iowa, Wyoming, and Massachusetts Reports.
Martin C. Rissel, et. al., Cost-Effective Staffing of Crews During Winter, Aug. 1985, p. 91, Public Works.
H. Randolph Thomas, Jr. et al., Construction Contract Staffing Needs, Jun. 1980, American Society of Civil Engineers, Journal of Construction Division pp. 101-116/Attached are the Studies of Washington State Highway Commision, and North Dakota State Highway Department.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Discrete-event simulation-based method for staffing highway main does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Discrete-event simulation-based method for staffing highway main, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Discrete-event simulation-based method for staffing highway main will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-544840

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.