Electricity: battery or capacitor charging or discharging – Battery or cell discharging – With charging
Reexamination Certificate
2009-08-14
2010-11-09
Tso, Edward (Department: 2858)
Electricity: battery or capacitor charging or discharging
Battery or cell discharging
With charging
C320S116000, C320S119000, C320S135000
Reexamination Certificate
active
07830122
ABSTRACT:
A control signal generating circuit used in a battery management system may stably generate a control signal. The control signal generating circuit includes a first signal line transmitting a first control signal having an on-level or an off-level, a second signal line transmitting a second control signal having an on-level or an off-level, and a third signal line transmitting a third control signal having an on-level or an off-level. In addition, the control signal generating circuit includes a transistor including a first electrode coupled to the first signal line and a second electrode applied with the off-level. The transistor electrically connects the first and second electrodes and converts the first control signal into a fourth control signal by being turned on based on the second and third control signals. Finally, the control signal generating circuit includes a circuit unit generating a fifth control signal having the on-level when the second and third control signals are input and have the off-level.
REFERENCES:
patent: 5281871 (1994-01-01), Mori et al.
patent: 5773962 (1998-06-01), Nor
patent: 6404163 (2002-06-01), Kapsokavathis et al.
patent: 6509718 (2003-01-01), Sakai et al.
patent: 6661260 (2003-12-01), Nakahara et al.
patent: 6788132 (2004-09-01), Lim et al.
patent: 7548821 (2009-06-01), Tae et al.
patent: 2003/0044689 (2003-03-01), Miyazaki et al.
patent: 2005/0127874 (2005-06-01), Lim et al.
patent: 2006/0001403 (2006-01-01), Yudahira
patent: 2007/0120534 (2007-05-01), Arai
patent: 2007/0188149 (2007-08-01), Miyamoto
patent: 2008/0030169 (2008-02-01), Kamishima et al.
patent: 2008/0088279 (2008-04-01), Lim et al.
patent: 2008/0156551 (2008-07-01), Kawahara et al.
patent: 2008/0157718 (2008-07-01), Ohnuki
patent: 1447305 (2003-10-01), None
patent: 0589287 (1993-09-01), None
patent: 4-302523 (1992-10-01), None
patent: 2001-204141 (2001-07-01), None
patent: WO 99/01918 (1999-01-01), None
Office Action issued in corresponding European patent Application No. 06120364.2 dated Feb. 19, 2008.
U.S. Appl. No. 11/516,693, filed Sep. 7, 2006, Han-Seok Yun et al., Samsung SDI Co., Ltd.
Chinese Office Action No. 100101 dated May 4, 2010.
Multi-unit battery cell battery voltage measurement, Electronical Measurement & Instrumentation, Nov. 30, 1999 (Abstract).
Lim Gye-Jong
Seo Se-Wook
Yun Han-Seok
Boateng Alexis
Knobbe Martens Olson & Bear LLP
Samsung SDI & Co., Ltd.
Tso Edward
LandOfFree
Control signal generation circuit and battery management... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Control signal generation circuit and battery management..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Control signal generation circuit and battery management... will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-4166026