ABSTRACT:
Wind power installations were initially always erected in the form of individual units and it is only in recent years that, caused also by administrative and building regulations, wind power installations are frequently installed in wind parks. In that respect a wind park in its smallest unit is an arrangement of at least two wind power installations, but frequently markedly more. By way of example mention may be made of the wind park at Holtriem (East Frisia) where more than 50 wind power installations are set up in an array. It is to be expected that the number of units and also the installed power of the wind power installations will also increase greatly in the forthcoming years. In most cases the wind potential is at its greatest in regions of the power supply networks with a low level of short-circuit power and low population density. It is precisely there that the technical connection limits are quickly reached by the wind power installations, with the result that it is then no longer possible for further wind power installations to be set up at such sites. A method of operating a wind park comprising a plurality of wind power installations, wherein the wind park is connected to an electrical power supply network into which the electrical power produced by the wind park is fed and the wind park and/or at least one of the wind power installations of the wind park has a control input, by means of which the electrical power of the wind park or one or more individual wind power installation or installations can be set in a range of between 0 and 100% of the respective power to be made available, in particular the nominal power, and that there is provided a data processing apparatus which is connected to the control input and by means of which the setting value is set in the range of between 0 and 100%, depending on how great is the power that the overall wind park provides at its output for feeding into the energy network and wherein the operator (PSU) of the electrical supply network to which the wind park is connected can adjust the power delivered by the wind park by way of the control input.
REFERENCES:
patent: 3988592 (1976-10-01), Porter
patent: 4159427 (1979-06-01), Wiedemann
patent: 4189648 (1980-02-01), Harner
patent: 4511807 (1985-04-01), Somerville
patent: 4656413 (1987-04-01), Bourbeau
patent: 4982141 (1991-01-01), Pace et al.
patent: 4994684 (1991-02-01), Lauw et al.
patent: 5028804 (1991-07-01), Lauw
patent: 5082077 (1992-01-01), Holka
patent: 5083039 (1992-01-01), Richardson et al.
patent: 5239251 (1993-08-01), Lauw
patent: 5734257 (1998-03-01), Schauder et al.
patent: 5798631 (1998-08-01), Spee et al.
patent: 5798632 (1998-08-01), Muljadi
patent: 6049194 (2000-04-01), Nakagawa et al.
patent: 6219623 (2001-04-01), Wills
patent: 6323624 (2001-11-01), Henriksen
patent: 6815932 (2004-11-01), Wall
patent: 6836028 (2004-12-01), Northrup et al.
patent: 7233129 (2007-06-01), Erdman et al.
patent: 7256508 (2007-08-01), Altemark et al.
patent: 7268443 (2007-09-01), Kikuchi et al.
patent: 7271500 (2007-09-01), Kimura et al.
patent: 2315003 (1999-07-01), None
patent: 1524162 (2004-08-01), None
patent: 296 21 449 (1997-02-01), None
patent: 196 20 906 (1998-01-01), None
patent: 197 56 777 (1999-07-01), None
patent: 2 330 256 (1999-04-01), None
patent: 2007832 (1990-01-01), None
patent: 8317568 (1996-11-01), None
patent: 9324740 (1997-12-01), None
patent: 10-341530 (1998-12-01), None
patent: 11-262298 (1999-09-01), None
patent: 2000-333373 (2000-11-01), None
patent: 2001234845 (2001-08-01), None
patent: WO 92/14298 (1992-08-01), None
patent: 93/11604 (1993-06-01), None
patent: WO 97/45908 (1997-12-01), None
patent: WO 99/33165 (1999-07-01), None
patent: WO 01/25630 (2001-04-01), None
patent: 01/73518 (2001-10-01), None
patent: WO 01/86143 (2001-11-01), None
patent: 02086315 (2002-10-01), None
ANSI/IEEE, “IEEE Recommended Practice for Utility Interconnection of Small Wind Energy Conversion System,” pp. 7-12, Nov. 30, 1987, retrieved from http://ieeexplore.ieee.org/iell/2358/1238/00029137.pdf?is Number=1238&prod=STD&arnumber=29137&arST=&ared=&arAuthor= on Dec. 2, 2002.
Arantxa, T. et al., “Digital Simulation Performance of a Wind Farm,” inProceedings of the 10thMediterranean Electrotechnical Conference, Melecon 2000, vol. III, pp. 1153-1156.
Criado, R. et al., “Análisis y Estrategias de Control de la Energia Eólica en el Sistema Eléctrico Español,”Cogeneracion y Renovables, pp. 93-103, Nov. 2000, retrieved from http://www.energuia.com/guia/images/DirFich/BIB1002.pdf on Dec. 2, 2002.
Svensson, J., “Voltage Angle Control of a Voltage Source Inverter Applicaton to a Grid-Connected Wind Turbine,” inProceedings of the European Conference on Power Electronics and Applications, Sevilla, Sep. 19-21, 1995, Brussels, Sep. 19, 1995, pp. 3539-3544.
Wind, T., “Wind Turbines Offer New Voltage Control Feature,”Power Engineering, 103(9):54-56, Sep. 1999.
Kundar P., “Power System Stability and Control,” McGraw-Hill, Inc., New York, 1994, Chapter 11, “Control of Active Power and Reactive Power,” pp. 581-687 (71 pages).
Smith, G.J., “SCADA in wind farms,” in The Institution of Electrical Engineers Colloquium on Instrumentation in the Electrical Supply Industry, Jun. 29, 1993, pp. 11/1-11/2 (3 pages).
Borle et al., “Development and Testing of a 20-kW Grid Interactive Photovoltaic Power Conditioning System in Western Australia,” IEEE Transactions on Industry Applications, vol. 33, No. 2, Mar./Apr. 1997, pp. 502-508.
Haller, “A 500 kW Variable Speed Gearless Wind Turbine Generator for the American Market,” Windpower 94, Minnesota, May 11, 1994, pp. 151-154.
Heier, “Grid Integration of W4d Energy Conversion Systems,” John Wiley & Sons Ltd., West Sussex, England, 1998, pp. 210-211, 273-278, and 326-339.
Richardson et al., “Wind Energy Systems,” Proceedings of the IEEE, vol. 81, No. 3, Mar. 1993, pp. 378-389.
“The Benchmark in Windenergy-Technology,” Enercon, Aurich, Germany, Dec. 5, 2003, pp. 1-28.
Mohandesi Iraj A
Patel T C
Seed IP Law Group PLLC
LandOfFree
Method for operating a wind park does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method for operating a wind park, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method for operating a wind park will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-4063857