Production controller for facility group work start

Boots – shoes – and leggings

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

36446806, G06F 1900, G06G 766

Patent

active

059930411

ABSTRACT:
For enabling a execute of work start scheduling based on individual lot attributes, a production controller controls includes a lot schedule managing section for managing a first work estimate schedule for each of lots existing in finite buffer facility groups continuous in a working procedure, a facility schedule managing section for managing an operation stopping estimate schedule and a second work estimate schedule for each of facilities of the continuous finite buffer facility groups, and a buffer schedule managing section for managing a utilization estimate schedule for each of the finite buffer facility groups. With reference to the first work estimate schedule, the operation stopping estimate schedule, the second work estimate schedule, and the utilization estimate schedule, a continuous process scheduling section carries out scheduling of the lots put in a continuous zone of the continuous finite buffer facility groups. With reference to the third work estimate schedule, a progress control section controls execution of the work relative to the lots arrived at the finite buffer facility groups.

REFERENCES:
patent: 4870592 (1989-09-01), Lampi et al.
patent: 5093794 (1992-03-01), Howie et al.
patent: 5369570 (1994-11-01), Parad
patent: 5521828 (1996-05-01), Ueda
patent: 5559710 (1996-09-01), Shahraray et al.
patent: 5748478 (1998-05-01), Pan et al.
patent: 5764543 (1998-06-01), Kennedy
B.R. Tibbits, "Flexible simulation of a complex semiconductor manufacturing line using a rule-based system", IBM J. Res. Develop., vol. 37, No. 4, pp. 507-521, Jul. 1993.
Henry D'Angelo, et al., "Even-driven model of unreliable production lines with storage", Int. J. Prod. Res., vol. 26, No. 7, pp. 1173-1182, 1988.
Vassilis S. Kouikoglou, et al., "An Exact Discrete-Event Model and Control Policies for Production Lines with Buffers", IEEE Transactions On Automatic Control, vol. 36, No. 5, pp. 515-527, May 1991.
Hishashi Tamaki, et al., "Modeling of Job-shop Scheduling Problem with In-process Buffer Capacity" T. SICE, vol. 31, No. 7, pp. 933-940, Jul. 1995.

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Production controller for facility group work start does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Production controller for facility group work start, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Production controller for facility group work start will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-1663731

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.