DESCRIPTION:

BRIEF SUMMARY
FIELD OF THE INVENTION

The invention relates to a construction method available for various architectures of large-scale high-rises, large-scale wall-bearing structures, single story and multi story viaducts spanning rivers and seas etc., more specifically to a lifting method of building construction from top to bottom.


BACKGROUND OF THE INVENTION

It is well-known, that existing construction method is a method adopting story-by-story construction from bottom to top, i.e. employing main machinery such as conventional tower cranes, truck cranes, hoists tubular steel scaffolds etc., starting from ground foundation, a building is constructed story by story from bottom to top, finally a top story is built, corresponding scaffolds are mounted around the building, when a top story is roofed, the main construction has been completed, then outer wall decorations being started and interior finishings ultimately conducted. Although problems of long construction period, high cost, difficulties in special building construction, and unsafe operation of the builders occurred, the above method is commonly used in China and all over the world. For a long time, aiming at above defects, massive work in tackling the key problems has been conducted by the engineering technical personnel in building industry, such as improving building materials and auxiliary tools, reforming construction methods and enhancing safety protection measures etc., but due to the inherent drawbacks in current construction method from bottom to top, the above problems have not been thoroughly solved.
Recently a brand-new construction method being conceived by the people, i.e. a countertrend construction method from top to bottom. For example, on Sep. 18, 1996, the "SHENZHEN SPECIAL ZONE DAILY" reported that, Japanese builders completed a medium height building by a hoisting method from top to bottom, in the method, a top story is constructed on the ground, the story is lifted with a plurality of tower cranes, then a penultimate story is built beneath the top story, the process was conducted story by story in sequence, until a whole building being completed. Partial defects of existing traditional method have been supplemented to a certain extent by the above method, e.g. construction schedule being accelerated, building cost reduced and safety betterment of the builders ensured, but since tower cranes are adopted for main auxiliary equipment in above new construction method, affected by the tonnage and height of tower crane and layout between a tower crane and building, accommodation of the method is greatly limited, which is only applicable in construction of ordinary buildings having finite height and area, and is absolutely unable to construct special architectures such as high-rises or skyscrapers, large area wall-bearing structures, and various longspan bridges etc., therefore the problems of prior art have not been completely solved.


DISCLOSURE OF THE INVENTION

An object of the invention is to provide a construction method of novel conception, a lifting method of building construction from top to bottom, no traditional building equipment such as existing tower cranes, hoists, tubular steel scaffolds etc. are needed, whereas using fully feasible jacking apparatuses and a method of constructing story by story from top to bottom can not only effectively overcome the defects of long construction period, high cost, difficulties in special building construction and lacking of builder safety protection in the prior art, but also have the advantages of wide accommodation, and is extensively applicable in special architectures such as high-rises or skyscrapers, large area wall-bearing structures and diversified longspan bridges etc.
The object of the invention is realized via a following program: a lifting method of building construction from top to bottom chiefly adopted a method of constructing story by story downwards from the top story of a building, wherein all the support columns needed by a building employ steel story posts, various floors

REFERENCES:
patent: 3594965 (1971-07-01), Saether
patent: 3722169 (1973-03-01), Boehmig
patent: 4006567 (1977-02-01), Flannery
patent: 4058952 (1977-11-01), Donnelly
patent: 4250671 (1981-02-01), Hirsh et al.
patent: 4251974 (1981-02-01), Vanderklaauw
patent: 5205673 (1993-04-01), Bolin et al.
patent: 5839239 (1998-11-01), Jang

LandOfFree

Say what you really think

Search LandOfFree.com for the USA inventors and patents. Rate them and share your experience with other people.

Rating

Lifting method of building construction from top to bottom does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Lifting method of building construction from top to bottom, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Lifting method of building construction from top to bottom will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFUS-PAI-O-1474873

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.