Hydraulic and earth engineering – Earth treatment or control – Shoring – bracing – or cave-in prevention
Patent
1981-09-16
1984-08-14
Corbin, David H.
Hydraulic and earth engineering
Earth treatment or control
Shoring, bracing, or cave-in prevention
405299, E21D 2308
Patent
active
044654065
ABSTRACT:
A mine roof support unit has a roof bar supported on a floor sill by hydraulic props. The floor sill is constituted by a face-side floor sill part and a goaf-side floor sill part. The two floor sill parts are telescopically interconnected. Each of the floor sill parts supports a pair of hydraulic props. Hydraulic rams are provided for moving each of floor sill parts relative to the other floor sill part in the direction of roof support unit advance.
REFERENCES:
patent: 4231684 (1980-11-01), Oppenlander et al.
Corbin David H.
Gewerkschaft Eisenhutte Westfalia
LandOfFree
Mine roof support unit does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Mine roof support unit, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Mine roof support unit will most certainly appreciate the feedback.
Profile ID: LFUS-PAI-O-112114